The word “complete” has no set meaning in a contract. One company may include the plans and products. Another may price only the fitting work. The owner must give each company the same clear boundary.
Which project are you actually buying?
| Project level | Typical boundary | Main risk |
|---|---|---|
| Surface update | Paint, hardware, fixtures or backsplash | New work meeting old surfaces |
| Cabinet-led replacement | Cabinets and counters, usually with the footprint retained | Appliance fit and omitted transitions |
| Complete same-layout remodel | Full tear-out and coordinated replacement without major moves | Trade interfaces and temporary kitchen loss |
| Layout-changing remodel | Sink, cooking, walls, openings or island move | Structure, systems, documents and permits |
| Reconstruction | Kitchen work affects adjoining rooms or building systems | Scope growth and hidden problems |
The label matters less than the work list. A same-layout job may still need new power, pipes or a hood permit. A large style change may keep the current systems.

Describe the finished room before its parts
Write a short note that describes the finished room. Mark the room limits, doors and cabinet plan. Add each appliance, worktop, floor edge, light, hood and paint area. Say which nearby walls or floors need repair after the work.
Add a measured plan and product list. The design guide shows how to turn goals into a plan that can be priced.
Record existing conditions in Albuquerque, New Mexico homes
Match the site check to the home. A central Albuquerque house may have old additions, plaster or adobe walls. It may also have few power circuits or pre-1978 paint. A Northeast Heights home may show past changes to lights and appliances. Newer homes still need checks of the panel, hood, gas and room sizes.
The City says it generally does not have residential plans for homes built before August 1, 2012. Treat missing plans as a reason to measure and investigate, not as proof that a wall or system is original. If a proposed hood outlet changes the exterior of a home in a Historic Protection Overlay zone, confirm whether the City requires a Certificate of Appropriateness before the route is fixed.
Before pricing, record:
- room, opening and ceiling dimensions;
- panel location, service rating and known kitchen circuits;
- water, drain, gas and exhaust routes;
- floor construction and height changes at doorways;
- signs of leaks near sink, dishwasher, refrigerator or exterior wall;
- wall function and any available original or alteration drawings;
- home age and the EPA lead-safe question; and
- delivery, storage, debris and daily access routes.
Do not claim that a hidden problem has been checked. Write down the open point. Name who will check it and when. State how any added work will be priced.
Put every connected trade on the scope
The cabinet, appliance and trade plans must match. The sink base needs room for pipes. Fridge doors need space to open. A hood needs a clear path to the outside. The final island sets the pendant spots. The tile plan can set the power point spots.
Use a simple table to show who does each task. Add the input, sign-off and due date. Check it before orders, early trade work and wall close-up.
Use the layout and systems guide for electrical, plumbing, gas, ventilation and structural questions.
Separate allowances from selections
An allowance is not a product choice. State the amount, quality level, tax, freight and fitting cost. Also state how the final price will change. A counter allowance needs an area, material, edge, splash and cutout count.
Owner-bought goods need a clear plan too. Say who checks the fit, places the order and takes delivery. Add who stores, fits, hooks up or returns each item. Use the finish guide for the full list.
The Water Utility Authority describes Albuquerque-area water as moderately hard to hard depending on the source blend. Check the actual distribution-zone information and product instructions before adding filtration or treatment. At minimum, assign faucet, dishwasher, refrigerator-water and any treatment connections in the product and plumbing schedules.
Confirm permits using the address
Albuquerque lists power changes, new hoods and pipe changes as permit examples. Rio Rancho says most remodel and trade work needs permits. Los Ranchos and Corrales use their own village process. Parts of Sandoval County may need county review before a state permit.
Use the local permit guide. Get an answer for the address and work list. The deal should assign plans, forms, fees, replies, checks and final sign-off.
Include household protection and temporary use
The contract should cover dust, floors, doors and the waste route. It should state work hours, storage and daily clean-up. For a pre-1978 home, ask how the company will check the EPA RRP rule before it disturbs paint.
Plan a basic kitchen if the room will be out of use. Set notice for water or power shutoffs. Keep pets and lived-in rooms away from the work.
Set dates for design, permits and product orders
Cabinet sign-off is one key step. The sink, tap, hood, lights, tile and hardware can also affect early work. A sound plan gives design, permits, orders and site work their own dates.
The timeline guide shows what must be ready before tear-out. A date is only a target when the plans and goods are not ready.
When is a complete remodel poor value?
If the layout works and the cabinet boxes are sound, a smaller update may be enough. Fix leaks, unsafe wires, wall movement or water harm first. Keep a useful layout when moving pipes or power adds cost but little daily value.
The smallest clear work list may be the best choice. “Complete” means that no known task is hidden. It does not mean that every part must go. Check the choice against the 2026 cost guide.
Compare duty before price
Check the exact company with the New Mexico Construction Industries Division. Compare who controls plans, orders, qualified trades and permits. Do the same for site care, changes and final tasks. Ask the company for references and proof of insurance.
Use this final checklist:
- Measured existing plan and finished-room drawing
- Appliance and cabinet schedule
- Counter, backsplash, floor and paint limits
- Demolition, disposal and protection
- Wall, framing and structural assumptions
- Electrical, plumbing, gas and exhaust work
- Permit and inspection duty
- Allowances and owner purchases
- Material lead times and start conditions
- Payment, changes, corrections and closeout
Frequently asked questions
Does a complete remodel include appliances?
Only when the deal says so. Owner-bought appliances still need model numbers. The deal must assign delivery, fitting, hook-up and testing.
Can a same-layout project be complete?
Yes. A full job can keep the sink and range in place. Keeping sound service points may cut risk and cost.
Who should pull the permits?
Assign forms, fees, replies, site checks and final sign-off in writing. The right permit office decides what the address and work need.
Can a contractor price from a cabinet-store drawing?
It is a useful start. It may miss current systems, tear-out and wall work. It may also miss appliance needs, permits, site care or nearby repairs.